50 MWe of AI compute, cogeneration-led.
Twelve MWM TCG 2032B V16 cogeneration units anchor a brownfield campus delivering electrons, cooling, and fiber to Frankfurt. The tenant brings the AI compute. We're seeking a JV partner to fund the powerplant build.
Power, cooling, fiber, pad.
Tenant brings the boxes.
Three things distinguish this project from any other AI-power play in Europe right now.
Power, cooling, fiber, pad.
49.5 MWe firm (N+1) from twelve MWM cogen units. Up to 52 MW thermal recovery for district heat or absorption cooling. Dual fiber to Frankfurt. Tenant brings the AI containers — SuperPOD-class, modular, hyperscaler-spec.
Scarce slot, real ground.
New TCG 2032B V16 orders today carry significant lead times. Our slot is locked. Brownfield site, already zoned industrial, factory hall under repurpose — no building permit required.
Operator, not a SPAC.
Karlin1AI principals have operated CHP plants in the Czech Republic since 2012. We hold the site, the gas contract, the MWM slot, and EIA Cat. II screening ready to file. Partner brings capital and tenant origination.
Two phases
from first close to full N+1.
Phase 1 is six units online with tenant revenue active. Phase 2 brings the full N+1 fleet and steady-state district heat.
Six MWM units online. Tenant container pad operational. BESS commissioned. Phase 1 revenue active while full-site permitting completes in parallel.
Twelve units installed — eleven running plus one standby. Steady state. District heat offtake live. Phase 2 ROFR opens.
Engineered around
the scarce hardware we control.
Power & Storage Karlin1AI scope
Tenant Pad & Connectivity Tenant scope
We own the power platform.
You run the data hall.
Karlin1AI contributes i.
- Brownfield site · long-term ground lease · permitted land use
- Locked MWM order-book slot — 12 units, slot confirmed
- Gas supply contract — secured terms in place
- Grid interconnection rights
- EIA & IPPC permitting in progress
- District heat offtake in negotiation with municipality
- Cooling capacity (air or water) on-site
- Dual-fiber connectivity to Frankfurt
- CHP operations track record · Czech Republic since 2012
- Grid-services capability (mFRR / aFRR)
Partner contributes ii.
- CAPEX for the powerplant turnkey to switchgear
- CAPEX for 10 MW Li-ion BESS
- Tenant pipeline & commercial origination
- Tenant-led container deployment & UPS
- Cooling design for high-density AI loads
- Carrier procurement & connectivity build
- Bankability & balance-sheet credibility
- SLA & tenant interface at switchgear handoff
Closing consideration + delivery milestone payment · carried equity in the JV SPV · joint board & governance · Phase 2 ROFR on +50 MWe under the same lessor.
What's done.
What's in flight.
Status6 / 9 complete
Risk & mitigation
Talk to us about
the joint venture.
We're looking for a partner with data-center operations experience and balance-sheet to move quickly. If that's you — or if you want to learn more before deciding — reach out directly. All enquiries treated in confidence.