AI Power Campus · Czech Republic

50 MWe of AI compute, cogeneration-led.

Twelve MWM TCG 2032B V16 cogeneration units anchor a brownfield campus delivering electrons, cooling, and fiber to Frankfurt. The tenant brings the AI compute. We're seeking a JV partner to fund the powerplant build.

MWM TCG 2032B V16 cogeneration unit
MWM TCG 2032B V16 · 4.5 MWe
Engine
MWM TCG 2032B V16
Output
4.5 MWe / unit
Units
× 12 · order slot held
Configuration
N+1 generation
Total CHP eff.
87.8% with heat
Fuel readiness
NG · 25% H₂ · biomethane
Firm Power
49.5MWe
N+1 · 11 of 12 units active
Tenant Capacity
~32MW
Container-ready · liquid cooled
CHP Efficiency
87.8%
Total with heat recovery
Phase 2 Option
+50MWe
ROFR · same site, same lessor
Scroll
01 · What we offer

Power, cooling, fiber, pad.
Tenant brings the boxes.

Three things distinguish this project from any other AI-power play in Europe right now.

01 / 03

Power, cooling, fiber, pad.

49.5 MWe firm (N+1) from twelve MWM cogen units. Up to 52 MW thermal recovery for district heat or absorption cooling. Dual fiber to Frankfurt. Tenant brings the AI containers — SuperPOD-class, modular, hyperscaler-spec.

02 / 03

Scarce slot, real ground.

New TCG 2032B V16 orders today carry significant lead times. Our slot is locked. Brownfield site, already zoned industrial, factory hall under repurpose — no building permit required.

03 / 03

Operator, not a SPAC.

Karlin1AI principals have operated CHP plants in the Czech Republic since 2012. We hold the site, the gas contract, the MWM slot, and EIA Cat. II screening ready to file. Partner brings capital and tenant origination.

02 · Phased capacity ramp

Two phases
from first close to full N+1.

Phase 1 is six units online with tenant revenue active. Phase 2 brings the full N+1 fleet and steady-state district heat.

Phase 1 · First power 01 / 02
50%
of full N+1
25MWe
~half capacity online

Six MWM units online. Tenant container pad operational. BESS commissioned. Phase 1 revenue active while full-site permitting completes in parallel.

6 × TCG 2032B V16 commissioned
BESS online · container pad live
Tenant revenue active
Phase 2 · Full N+1 02 / 02
100%
N+1 steady
49.5MWe
Full firm capacity

Twelve units installed — eleven running plus one standby. Steady state. District heat offtake live. Phase 2 ROFR opens.

12 × TCG 2032B V16 installed
N+1 redundancy active
District heat offtake live
03 · Architecture & specification

Engineered around
the scarce hardware we control.

Power & Storage Karlin1AI scope

Generation
12 × MWM TCG 2032B V16
Per unit
4.5 MWe
Total output
54 MWe gross / 49.5 N+1
Electrical efficiency
44.6% LHV
Heat recovery
~52 MW thermal
Total CHP efficiency
87.8% with heat
Storage
10 MW Li-ion BESS
Redundancy
N+1 (11 of 12)
Ramp-up
< 5 min full output
Fuel readiness
NG · 25% H₂ · biomethane
Grid services
mFRR15 / aFRR capable

Tenant Pad & Connectivity Tenant scope

Delivery model
Container-ready pad
Tenant payload
SuperPOD · modular · custom
Rack density
> 100 kW / rack liquid
Power handoff
MV switchgear at pad
Cooling handoff
Chilled water · CDU-ready
UPS
Tenant-spec, containerized
Fiber
Dual route → Frankfurt
PUE envelope
1.15–1.25 tenant
Heat sink
District heat (in negotiation)
Design life
25+ years
04 · The partnership

We own the power platform.
You run the data hall.

Karlin1AI contributes i.

  • Brownfield site · long-term ground lease · permitted land use
  • Locked MWM order-book slot — 12 units, slot confirmed
  • Gas supply contract — secured terms in place
  • Grid interconnection rights
  • EIA & IPPC permitting in progress
  • District heat offtake in negotiation with municipality
  • Cooling capacity (air or water) on-site
  • Dual-fiber connectivity to Frankfurt
  • CHP operations track record · Czech Republic since 2012
  • Grid-services capability (mFRR / aFRR)

Partner contributes ii.

  • CAPEX for the powerplant turnkey to switchgear
  • CAPEX for 10 MW Li-ion BESS
  • Tenant pipeline & commercial origination
  • Tenant-led container deployment & UPS
  • Cooling design for high-density AI loads
  • Carrier procurement & connectivity build
  • Bankability & balance-sheet credibility
  • SLA & tenant interface at switchgear handoff
Indicative deal shape

Closing consideration + delivery milestone payment · carried equity in the JV SPV · joint board & governance · Phase 2 ROFR on +50 MWe under the same lessor.

05 · Permitting status & risk

What's done.
What's in flight.

Status6 / 9 complete

MWM order slotsAll twelve units · slot held
Locked
Site control · brownfield repurposeLong-term ground lease in place
Secured
Zoning · existing land useNo building permit required
In place
Gas supply contractTerms in place; no supply risk on Phase 1
Secured
Cooling capacity on-siteAir or water available
Available
Fiber to FrankfurtDual route, on-site / adjacent
Available
EIA Cat. II screeningStatutory window well-defined
Ready to file
IPPC permit (full 49.5 MWe)Filed concurrent with EIA
In prep.
District heat offtakeTerm sheet exchanged with municipality
In negotiation

Risk & mitigation

EIA
Cat. II, ready to file at close. Statutory window well-defined; expected outcome "no further EIA required."
IPPC
Filed concurrent with EIA close. Not gating for first MW.
Grid
Cogen-led design allows islanded operation during commercial finalization.
Heat offtake
Carbon-story upside, not gating. Cogen economics work without heat sale.
Tenant LOI
Power-led, not tenant-led. Targets late-cycle hyperscaler procurement.
DC track record
Container-tenant model removes DC ops scope. SLA at switchgear handoff.
Scope
Powerplant turnkey scope frozen. MWM pricing locked. No DC shell CAPEX.
Direct line · 06 · Contact

Talk to us about
the joint venture.

We're looking for a partner with data-center operations experience and balance-sheet to move quickly. If that's you — or if you want to learn more before deciding — reach out directly. All enquiries treated in confidence.